PROJECT RESULTS
Key numbers from this project.
Contract value
~201 k PLN
Luminaires installed
37
New lighting poles
21
Modernization system
“Design and Build”
Context & Challenge
Gmina Jasło aimed to improve the safety and comfort of road users by expanding lighting in selected locations. The challenge involved carrying out infrastructure works commissioned by Gmina Jasło and PGE Dystrybucja S.A., while meeting technical and formal requirements.
Scope & Solution
The project was carried out under the “design and build” formula. The scope included adding new luminaires, installing new lighting poles, installing new pole positions and constructing cable lines for road lighting. As part of the investment, 37 lighting luminaires were installed and 21 poles were erected.
Outcome
The result is a more functional road lighting system, improving visibility and safety after dark. The investment filled in missing lighting points and expanded the infrastructure with new luminaires, poles and lighting lines.